It has been fifty years that “oh no they take so long to build, better never start” that by today we would have completely decarbonized energy generation if we started actually building them.
Knowing nothing about the process, can i ask, is the time it takes to build one based on current standards? Like if we were to focus more resources into the construction of new plants wouldnt they be built faster?
The latest nuclear power plant built in the US is seven years behind schedule and almost $20 billion over budget. It bankrupted Westinghouse Energy, and is slated to cost consumers more than double what comparable electricity costs because of these overruns.
And this was a plant that was using newer construction techniques like offsite assembly to reduce costs.
Were there mistakes during the build process like lowballing spending figures or building time so they are permitted to build or did they just royally fuck up some other way?
Except the plants take so long to build they won’t be ready until we’re at 2°C
It has been fifty years that “oh no they take so long to build, better never start” that by today we would have completely decarbonized energy generation if we started actually building them.
We could have also built solar collectors in orbit and beamed carbon-free electricity to Earth if we started 50 years ago.
Heck, if we funded fusion research properly there’s a good chance we’d have had that by the mid 90s
Knowing nothing about the process, can i ask, is the time it takes to build one based on current standards? Like if we were to focus more resources into the construction of new plants wouldnt they be built faster?
The latest nuclear power plant built in the US is seven years behind schedule and almost $20 billion over budget. It bankrupted Westinghouse Energy, and is slated to cost consumers more than double what comparable electricity costs because of these overruns.
And this was a plant that was using newer construction techniques like offsite assembly to reduce costs.
Looks like one holdup nowadays is the ability to source HALEU (Uranium that is 4x as enriched as the typical fuel used in current reactors).
https://www.energy.gov/ne/articles/what-high-assay-low-enriched-uranium-haleu
https://www.wyomingpublicmedia.org/natural-resources-energy/2022-12-14/the-opening-of-terrapowers-nuclear-plant-in-kemmerer-will-be-delayed-by-two-years
It was sourceable from Russia before they invaded Ukraine.
Were there mistakes during the build process like lowballing spending figures or building time so they are permitted to build or did they just royally fuck up some other way?